《2006馬來西亞建筑師公會分包合同協(xié)議與條款》翻譯報告
[Abstract]:Under the background of the continuous development of economic globalization, more and more Chinese enterprises begin to cooperate with foreign enterprises, and their cooperation usually requires signing contracts. As a result, there is a growing demand for contract translation. Pam is the abbreviation for Malay (Pertubuhan Akitek Malaysia) of the Malaysian Institute of Architects. As of May 20, 2017, The 2006 Malaysia Association of Architects subcontract Agreement and terms is the latest subcontract in Malaysia. This paper will take the translation of some of the subcontract agreements and terms of the Malaysian Association of Architects 2006, in which the translator is involved in the actual work of West China (Malaysia) Co., Ltd., as an example. Under the guidance of Peter Newmark's semantic translation and communicative translation theory, combined with the lexical and syntactic characteristics of architectural subcontract texts, this paper makes a preliminary study on the corresponding translation methods. Based on the analysis of Chinese and English parallel texts of construction contract, this paper summarizes the characteristics of language in construction contract. Through the analysis of lexical and syntax in the subcontract text translated by the translator, this paper summarizes the difficulties encountered in the process of translation, namely, the translation of professional terms, the translation of indicative words, the translation of synonyms, and the translation of long difficult sentences. The translation methods used are analyzed accordingly. Finally, the translator summarizes his experience in translation practice and hopes to provide further reference for translators.
【學位授予單位】:西南科技大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:H315.9
【相似文獻】
相關會議論文 前1條
1 呂靈犀;;建筑工程分包合同備案監(jiān)管探討[A];實踐與思考:七省市第十二屆建筑市場與招標投標聯(lián)席會優(yōu)秀論文集[C];2012年
相關重要報紙文章 前10條
1 十七局集團 范利鵬 邊均安;分包合同無效后的結算依據(jù)[N];中國鐵道建筑報;2014年
2 宋軍;分包合同[N];政府采購信息報;2006年
3 肖太壽;建筑業(yè)總分包合同存在的涉稅風險及管控措施[N];財會信報;2012年
4 徐金余;分包合同的效力可否補正[N];江蘇法制報;2005年
5 李健 張慶云;依法有據(jù) 主從連帶 地位明確[N];建筑時報;2001年
6 ;合同轉讓的禁止及分包合同[N];中國水利報;2001年
7 朱建美;總結審理難點 探索應對措施[N];建筑時報;2010年
8 肖太壽;建筑業(yè)總分包合同存在的涉稅風險及管控措施[N];財會信報;2012年
9 張偉清 陶靖;發(fā)生爭執(zhí)時如何適用分包合同中的免責條款[N];中國建設報;2002年
10 上海元始律師事務所 李宗猛 律師;潛規(guī)則下的企業(yè)自我保護[N];建筑時報;2010年
相關碩士學位論文 前10條
1 盧書寶;北京城建七公司勞務分包管理系統(tǒng)的設計與實施[D];山東大學;2015年
2 金莉;《2006馬來西亞建筑師公會分包合同協(xié)議與條款》翻譯報告[D];西南科技大學;2017年
3 李鵬;石化工程項目施工分包合同管理研究[D];華北電力大學(北京);2011年
4 曾s,
本文編號:2487489
本文鏈接:http://www.lk138.cn/shoufeilunwen/zaizhiboshi/2487489.html