中国韩国日本在线观看免费,A级尤物一区,日韩精品一二三区无码,欧美日韩少妇色

當(dāng)前位置:主頁(yè) > 科技論文 > 交通工程論文 >

隧道監(jiān)控系統(tǒng)開(kāi)發(fā)的項(xiàng)目管理方法研究

發(fā)布時(shí)間:2018-12-05 21:27
【摘要】:近年來(lái),公路隧道在全國(guó)各地疏解交通擁堵中起到越來(lái)越重要的作用,隧道建設(shè)規(guī)模與日俱增。由于隧道的環(huán)境特殊,,隧道的安全性以及隧道管理的穩(wěn)定性是隧道運(yùn)營(yíng)狀況最重要的考核指標(biāo),因此隧道對(duì)通風(fēng)、照明、交通控制等監(jiān)控系統(tǒng)的要求非常高,工業(yè)化軟件產(chǎn)品性能指標(biāo)、網(wǎng)絡(luò)性能等對(duì)整個(gè)系統(tǒng)的安全平穩(wěn)運(yùn)行至關(guān)重要。利用現(xiàn)代化的控制理論和先進(jìn)的監(jiān)控設(shè)備,建立一套完整的隧道監(jiān)控系統(tǒng),調(diào)節(jié)交通流、控制隧道通風(fēng)和照明,防患事故于未然,對(duì)于提高隧道行車(chē)的安全性、快速性和舒適性尤為重要。但隧道監(jiān)控系統(tǒng)既有硬件,又有軟件,系統(tǒng)復(fù)雜,工作量大,計(jì)劃性強(qiáng)等特點(diǎn),施工時(shí)須與多個(gè)專(zhuān)業(yè)(如土建、強(qiáng)電、裝飾、交通、排水等)協(xié)同工作,要求施工方有足夠的經(jīng)驗(yàn),組織策劃及協(xié)作能力等。 項(xiàng)目管理是現(xiàn)代管理學(xué)的重要分支,經(jīng)過(guò)長(zhǎng)期的探索、實(shí)踐和總結(jié),已發(fā)展為完善的學(xué)科理論體系和管理方法。項(xiàng)目管理理論及方法運(yùn)用于隧道監(jiān)控系統(tǒng)開(kāi)發(fā)項(xiàng)目,在時(shí)間管理、成本控制、質(zhì)量管理、風(fēng)險(xiǎn)管理、溝通管理、采購(gòu)管理、人力資源管理等方面提供科學(xué)依據(jù)及解決辦法。 本文通過(guò)研究項(xiàng)目管理在隧道監(jiān)控系統(tǒng)開(kāi)發(fā)項(xiàng)目中的運(yùn)用,提出適合公路隧道監(jiān)控系統(tǒng)開(kāi)發(fā)項(xiàng)目的溝通機(jī)制模型和調(diào)試、驗(yàn)收模型,有利于同類(lèi)公路隧道監(jiān)控系統(tǒng)開(kāi)發(fā)項(xiàng)目的管理和快速套用。 總結(jié)了適合公路隧道監(jiān)控系統(tǒng)開(kāi)發(fā)項(xiàng)目的作業(yè)時(shí)間估算方法。提出進(jìn)度監(jiān)控時(shí)間點(diǎn)的選擇方法。提出基于關(guān)鍵路徑的掙值法與總掙值法結(jié)合分析進(jìn)度的方法,并對(duì)比本文提出的分析結(jié)論,能夠準(zhǔn)確得到公路隧道監(jiān)控系統(tǒng)開(kāi)發(fā)項(xiàng)目進(jìn)度。
[Abstract]:In recent years, highway tunnels play a more and more important role in relieving traffic congestion in various parts of the country, and the scale of tunnel construction is increasing day by day. Because of the special environment of the tunnel, the safety of the tunnel and the stability of the tunnel management are the most important assessment indexes of the tunnel operation condition. Therefore, the tunnel requires the ventilation, lighting, traffic control and other monitoring systems to be very high. The industrial software product performance index, network performance and so on are very important for the whole system to run safely and smoothly. By using modern control theory and advanced monitoring equipment, a complete tunnel monitoring system is set up to regulate traffic flow, control tunnel ventilation and lighting, prevent accidents, and improve the safety of tunnel driving. Speed and comfort are particularly important. However, the tunnel monitoring system has both hardware and software. The system is complex, heavy workload, strong planning and so on. In construction, it is necessary to work in coordination with many specialties (such as civil construction, strong electricity, decoration, traffic, drainage, etc.). Require adequate experience, organization, planning and collaboration skills of the construction side. Project management is an important branch of modern management. After a long period of exploration, practice and summary, it has developed into a perfect discipline theory system and management method. The theory and method of project management are applied to the development of tunnel monitoring system, which provides scientific basis and solution in time management, cost control, quality management, risk management, communication management, procurement management, human resource management and so on. By studying the application of project management in tunnel monitoring system development project, this paper puts forward the communication mechanism model, debugging and acceptance model suitable for highway tunnel monitoring system development project. It is beneficial to the management and rapid application of the similar highway tunnel monitoring system development project. The working time estimation method suitable for highway tunnel monitoring system development project is summarized. A method of selecting time points for monitoring progress is proposed. This paper puts forward the method of combining earned value method based on critical path and total earned value method to analyze the progress, and compares the analysis conclusion of this paper, and can accurately get the progress of highway tunnel monitoring system development project.
【學(xué)位授予單位】:武漢理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類(lèi)號(hào)】:U453.8;TP277

【參考文獻(xiàn)】

相關(guān)期刊論文 前9條

1 何衛(wèi)平;張俊英;芮玉;;基于工程項(xiàng)目風(fēng)險(xiǎn)分擔(dān)的合作創(chuàng)新風(fēng)險(xiǎn)管理研究[J];改革與戰(zhàn)略;2011年05期

2 程朋;宣飛;;基于關(guān)鍵線(xiàn)路的改進(jìn)掙值法模型[J];科技和產(chǎn)業(yè);2013年10期

3 劉瑞國(guó);作業(yè)成本管理(ABCM)在項(xiàng)目管理中應(yīng)用研究[J];建筑管理現(xiàn)代化;2005年02期

4 慕光宇;李莉;張文孝;高國(guó)棟;;基于CPM和掙值法的船舶建造項(xiàng)目進(jìn)度控制的研究[J];科技管理研究;2011年07期

5 王傳強(qiáng);尹華麗;王新平;;掙值法在施工項(xiàng)目成本管理中的應(yīng)用探討[J];科技信息(科學(xué)教研);2007年33期

6 劉艷;;基于關(guān)鍵路徑法的軟件項(xiàng)目管理中的掙值分析[J];科學(xué)之友;2013年06期

7 郭丹丹;董雄報(bào);;掙值分析法在信息系統(tǒng)開(kāi)發(fā)項(xiàng)目中的應(yīng)用[J];商業(yè)文化(下半月);2011年11期

8 萬(wàn)偉,蔡晨,王長(zhǎng)峰;在單資源約束項(xiàng)目中的關(guān)鍵鏈管理[J];中國(guó)管理科學(xué);2003年02期

9 蔡晨,萬(wàn)偉;基于PERT/CPM的關(guān)鍵鏈管理[J];中國(guó)管理科學(xué);2003年06期

相關(guān)博士學(xué)位論文 前1條

1 馬成前;城市公路隧道智能監(jiān)控方法和系統(tǒng)研究[D];武漢理工大學(xué);2009年



本文編號(hào):2365493

資料下載
論文發(fā)表

本文鏈接:http://www.lk138.cn/kejilunwen/jiaotonggongchenglunwen/2365493.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶(hù)529c8***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com