隧道圍巖變形模式的識(shí)別與監(jiān)控預(yù)報(bào)研究

發(fā)布時(shí)間:2018-04-14 15:36

  本文選題:隧道 + 圍巖變形模式; 參考:《南京大學(xué)》2014年碩士論文


【摘要】:隨著隧道建設(shè)快速發(fā)展,地下空間圍巖穩(wěn)定性已成為地下工程建設(shè)的重要內(nèi)容之一,然而存在多方面因素的不可預(yù)知性和地下工程自身的復(fù)雜性,以及勘察技術(shù)手段的約束和有限性,導(dǎo)致在設(shè)計(jì)階段對(duì)于隧洞的圍巖參數(shù)、設(shè)計(jì)荷載力學(xué)參數(shù)等技術(shù)參數(shù)的獲取嚴(yán)重不足,對(duì)于圍巖變形破壞模式和機(jī)理認(rèn)識(shí)不清。因此在隧道施工過(guò)程中,要結(jié)合施工現(xiàn)場(chǎng)的地質(zhì)條件、監(jiān)控量測(cè)和超前地質(zhì)預(yù)報(bào)分析,用以修正設(shè)計(jì)參數(shù),優(yōu)化支護(hù)模式、調(diào)整施工方案。 本文以大廣高速隧道工程為研究對(duì)象,開(kāi)展的主要研究?jī)?nèi)容和研究結(jié)果如下: (1)通過(guò)對(duì)隧道的現(xiàn)場(chǎng)地質(zhì)描述和工程地質(zhì)條件分析,結(jié)合大量工程實(shí)例總結(jié)出十一種典型圍巖變形模式,得出了對(duì)變形破壞模式的認(rèn)知和判斷。 (2)通過(guò)地質(zhì)調(diào)查,結(jié)合對(duì)隧道掌子面精細(xì)化描述,利用節(jié)理產(chǎn)狀極點(diǎn)分布、玫瑰花圖、等密度圖等方法對(duì)區(qū)域測(cè)得的二十組節(jié)理面產(chǎn)狀進(jìn)行統(tǒng)計(jì)分析,得出三組優(yōu)勢(shì)節(jié)理產(chǎn)狀和傾、走向的變化區(qū)間,預(yù)測(cè)出可能發(fā)生變形破壞的圍巖部位。 (3)結(jié)合地表監(jiān)測(cè),宏觀反應(yīng)圍巖變形破壞模式可能為塑性膨脹內(nèi)鼓變形;初步識(shí)別變形破壞機(jī)理,利用隧道洞內(nèi)拱頂下沉監(jiān)控量測(cè)與周邊水平收斂監(jiān)控量測(cè)實(shí)時(shí)監(jiān)測(cè)隧道圍巖各部位的位移變形隨時(shí)間的變化,綜合多方面因素準(zhǔn)確地預(yù)報(bào)隧道圍巖變形破壞模式。 (4)對(duì)監(jiān)測(cè)數(shù)據(jù)的線性回歸分析和相關(guān)性檢驗(yàn),得出監(jiān)測(cè)數(shù)據(jù)誤差范圍為1.47mm,相關(guān)系數(shù)為0.99,可以很好的證明監(jiān)測(cè)數(shù)據(jù)的可靠性和圍巖變形的持續(xù)發(fā)展。 (5)詳細(xì)介紹了全站儀和應(yīng)力計(jì)在圍巖變形監(jiān)測(cè)中的應(yīng)用,其中包括技術(shù)參數(shù)、測(cè)點(diǎn)布設(shè)方式、數(shù)據(jù)采集與處理分析等,對(duì)圍巖壓力和錨桿應(yīng)力的工程實(shí)例分析研究得出不同部位開(kāi)挖所引起的圍巖位移、壓應(yīng)力變化特征。 (6)利用地質(zhì)雷達(dá)、TST地震波法綜合超前地質(zhì)預(yù)報(bào)對(duì)掌子面前萬(wàn)進(jìn)仃探測(cè),結(jié)合工程實(shí)例研究,重點(diǎn)講述不同類(lèi)型的不良地質(zhì)體圖像特征解譯和兩種技術(shù)方法的詳細(xì)解譯過(guò)程與結(jié)果分析,兩種方法結(jié)合得出前方圍巖情況與前方開(kāi)挖的實(shí)際情況相符。
[Abstract]:With the rapid development of tunnel construction, the stability of surrounding rock in underground space has become one of the important contents of underground engineering construction. However, there are many unpredictable factors and the complexity of underground engineering itself.As well as the limitation and restriction of the survey technology, the technical parameters such as the surrounding rock parameters of the tunnel and the mechanical parameters of the design load are seriously insufficient in the design stage, and the mode and mechanism of the deformation and failure of the surrounding rock are not clearly understood.Therefore, in the process of tunnel construction, it is necessary to combine the geological conditions of the construction site, monitor the measurement and advance geological prediction and analysis, in order to modify the design parameters, optimize the supporting mode, and adjust the construction plan.The main research contents and results of this paper are as follows:1) based on the field geological description and engineering geological condition analysis of the tunnel, eleven typical surrounding rock deformation modes are summarized in combination with a large number of engineering examples, and the cognition and judgement of the deformation and failure mode are obtained.(2) through geological survey, combining with the fine description of tunnel face, using the methods of joint occurrence pole distribution, rose map, iso-density map, etc., statistical analysis of 20 groups of joint surface occurrence was carried out in the region.The variation regions of three groups of dominant joints, such as occurrence, inclination and strike, are obtained, and the surrounding rock parts which may be deformed and destroyed are predicted.(3) combined with surface monitoring, the deformation and failure mode of macroscopic reaction surrounding rock may be plastic expansion and internal drum deformation, and the mechanism of deformation and failure can be preliminarily identified.The displacement and deformation of surrounding rock in tunnel are monitored in real time by using the monitoring measure of dome subsidence in tunnel tunnel and the monitoring measure of horizontal convergence around the tunnel. The deformation and failure mode of tunnel surrounding rock is accurately predicted by many factors.4) the linear regression analysis and correlation test of monitoring data show that the error range of monitoring data is 1.47 mm and the correlation coefficient is 0.99, which can well prove the reliability of monitoring data and the continuous development of surrounding rock deformation.The application of total station and stress meter in the deformation monitoring of surrounding rock is introduced in detail, including the technical parameters, the layout of measuring points, the data collection and processing analysis, etc.Based on the analysis of engineering examples of surrounding rock pressure and anchor stress, the variation characteristics of surrounding rock displacement and compressive stress caused by excavation in different parts are obtained.(6) using the TST seismic wave method of the geological radar to synthesize the advanced geological prediction to detect the front of the palmface, combining with the engineering example study,This paper focuses on the interpretation of the image features of different types of bad geological bodies and the detailed interpretation process and result analysis of the two technical methods. The combination of the two methods shows that the surrounding rock in front accords with the actual situation of excavation in front.
【學(xué)位授予單位】:南京大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類(lèi)號(hào)】:U456.3

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 杜靜;;板裂圍巖結(jié)構(gòu)彎曲失穩(wěn)分析[J];西部交通科技;2012年12期

2 傅鶴林,范臻輝,朱漢華,潘明軍;板裂介質(zhì)圍巖中的隧道襯砌與圍巖相互作用機(jī)理研究[J];公路交通科技;2003年05期

3 鄧尚平,傅鶴林;板裂介質(zhì)圍巖中的隧道襯砌與圍巖相互作用機(jī)理[J];采礦技術(shù);2003年01期

4 姜云,李永林,李天斌,王蘭生;隧道工程圍巖大變形類(lèi)型與機(jī)制研究[J];地質(zhì)災(zāi)害與環(huán)境保護(hù);2004年04期

5 王明年;劉大剛;劉彪;李海軍;;公路隧道巖質(zhì)圍巖亞級(jí)分級(jí)方法研究[J];巖土工程學(xué)報(bào);2009年10期

6 張鋼;;碎裂結(jié)構(gòu)圍巖塌方控制因素分析[J];科技資訊;2011年01期

7 孫健家;;軟弱淺埋隧道圍巖大變形控制技術(shù)研究[J];安徽建筑;2014年01期

8 李永林,馮學(xué)鋼,姜云,何川;隧道工程圍巖大變形及預(yù)測(cè)預(yù)報(bào)研究[J];現(xiàn)代隧道技術(shù);2005年05期

9 喬海兵;葛家良;;地下隧道圍巖結(jié)構(gòu)特性對(duì)注漿效果的影響[J];巖土工程界;2007年08期

10 黎剛;;用于大壩檢查的彩電系統(tǒng)[J];人民長(zhǎng)江;1992年05期

相關(guān)會(huì)議論文 前4條

1 黃運(yùn)飛;;關(guān)于圍巖弱化的幾個(gè)問(wèn)題[A];第四屆全國(guó)工程地質(zhì)大會(huì)論文選集(二)[C];1992年

2 姜云;;隧道工程圍巖大變形類(lèi)型與機(jī)制研究[A];中國(guó)公路學(xué)會(huì)2004年學(xué)術(shù)年會(huì)論文集[C];2004年

3 張延慶;;鉆開(kāi)油層井眼圍巖結(jié)構(gòu)模擬研究[A];第三屆全國(guó)結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集(下)[C];1994年

4 王士民;朱合華;蔡永昌;李曉軍;;曙光反分析程序及其在工程中的應(yīng)用[A];全國(guó)巖土工程反分析學(xué)術(shù)研討會(huì)暨黃巖石窟(錦繡黃巖)巖石力學(xué)問(wèn)題討論會(huì)文集[C];2006年

相關(guān)博士學(xué)位論文 前6條

1 房倩;高速鐵路隧道支護(hù)與圍巖作用關(guān)系研究[D];北京交通大學(xué);2010年

2 劉大剛;公路隧道施工階段巖體圍巖亞級(jí)分級(jí)研究[D];西南交通大學(xué);2007年

3 姜云;公路隧道圍巖大變形的預(yù)測(cè)預(yù)報(bào)與對(duì)策研究[D];成都理工大學(xué);2004年

4 李英杰;軟弱深埋隧道圍巖結(jié)構(gòu)特性及支護(hù)荷載確定方法研究[D];北京交通大學(xué);2012年

5 張哲;隧(巷)道開(kāi)挖擾動(dòng)區(qū)(EDZ)形成過(guò)程及機(jī)理的研究[D];東北大學(xué);2007年

6 代進(jìn);綜放回采巷道圍巖裂紋擴(kuò)展與類(lèi)板結(jié)構(gòu)及其非均稱(chēng)控制[D];山東科技大學(xué);2007年

相關(guān)碩士學(xué)位論文 前10條

1 龔書(shū)賢;層狀圍巖隧道力學(xué)特性及穩(wěn)定性研究[D];重慶大學(xué);2011年

2 劉彪;巖質(zhì)圍巖隧道的穩(wěn)定性研究[D];西南交通大學(xué);2008年

3 唐輝湘;散體圍巖淺埋隧道的開(kāi)挖與支護(hù)技術(shù)研究[D];長(zhǎng)沙理工大學(xué);2011年

4 曹君陟;圍巖動(dòng)載穩(wěn)定性的數(shù)值模擬研究[D];山東科技大學(xué);2005年

5 金昊;馬爾康隧道圍巖變形與穩(wěn)定性研究[D];西華大學(xué);2012年

6 熊亮;層狀圍巖隧道穩(wěn)定性及錨桿支護(hù)參數(shù)優(yōu)化[D];重慶大學(xué);2010年

7 全健;各級(jí)圍巖下隧道回填層合理剛度的區(qū)間分析[D];重慶交通大學(xué);2013年

8 林曉;浙江溫嶺長(zhǎng)嶼硐天不規(guī)則硐窟圍巖穩(wěn)定性研究[D];西南交通大學(xué);2013年

9 李日富;回采巷道圍巖三維受力特征及其維護(hù)的研究[D];太原理工大學(xué);2006年

10 何金峰;土石交界地層隧道開(kāi)挖圍巖與支護(hù)結(jié)構(gòu)穩(wěn)定性分析[D];中南大學(xué);2011年

,

本文編號(hào):1749956

資料下載
論文發(fā)表

本文鏈接:http://www.lk138.cn/kejilunwen/jiaotonggongchenglunwen/1749956.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶da73f***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com