山海關(guān)船廠項(xiàng)目多目標(biāo)集成管理評價(jià)研究
[Abstract]:With the enlargement of the scale and quantity of the ship project in Shanhaiguan Shipyard, the contradictions among the objectives of the project management also increase. In order to avoid purely pursuing the optimization of a certain index in the project management and neglecting the maximization of the overall benefit of the project, the enterprise needs to carry out the multi-objective integrated management of the project. Effectiveness evaluation becomes very important. Only through comprehensive analysis and evaluation can the enterprise improve the integrated management scheme and enhance the overall implementation effect of the project. Through the pre-evaluation of multi-objective integrated management scheme, Shanhaiguan Shipyard can select and perfect the best management scheme, and then improve the application of integrated management. First, the paper systematically analyzes the research achievements of domestic and foreign scholars in project management, target management, integrated management and other aspects. On the basis of summarizing the present situation of integrated management of Shanhaiguan Shipyard project, this paper analyzes the existing problems and causes of the integrated management, and then determines the research ideas and key points of the paper. Secondly, it analyzes the multi-objective integrated management of Shanhaiguan Shipyard project, and establishes the evaluation index system of multi-objective integrated management of the project, which includes safety. Four first-level decision-making objectives of quality, cost and time limit of a project are established, and eighteen second-level execution objectives are expanded from the first-level index decomposition, and all the indicators are analyzed systematically. Finally, relying on the multi-objective integrated management evaluation index system, the multi-objective integrated management evaluation model of Shanhaiguan Shipyard is constructed. Gray relational analysis method is used to construct the multi-objective integrated management evaluation model of Shanhaiguan Shipyard project. The integrated management scheme is evaluated and analyzed, and the best scheme is selected.
【學(xué)位授予單位】:燕山大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:F426.474;F273
【共引文獻(xiàn)】
相關(guān)期刊論文 前8條
1 李榮鑫;鄭小龍;;工程監(jiān)理在施工階段工程造價(jià)動(dòng)態(tài)控制研究[J];工程質(zhì)量;2012年09期
2 王志遠(yuǎn);丁元林;;基于項(xiàng)目管理視角的高校協(xié)同創(chuàng)新團(tuán)隊(duì)組織結(jié)構(gòu)分析與設(shè)計(jì)[J];高教探索;2012年06期
3 程朋;宣飛;;基于關(guān)鍵線路的改進(jìn)掙值法模型[J];科技和產(chǎn)業(yè);2013年10期
4 宰錫山;;淺談施工企業(yè)項(xiàng)目成本管理控制[J];中國外資;2013年01期
5 陳鈺;呂力瑯;周正榮;顧文英;蔣曉英;;多維度聯(lián)系臨床體系在醫(yī)院管理中的應(yīng)用及體會[J];中國醫(yī)院管理;2013年07期
6 羅福周;劉靜;;基于建設(shè)項(xiàng)目多目標(biāo)綜合優(yōu)化的關(guān)鍵鏈緩沖區(qū)研究[J];西安建筑科技大學(xué)學(xué)報(bào)(自然科學(xué)版);2013年06期
7 林正航;強(qiáng)茂山;袁尚南;;基于多維度項(xiàng)目管理模型的資源集成模式實(shí)證[J];項(xiàng)目管理技術(shù);2014年10期
8 常海防;皮天一;張杰;;多維度項(xiàng)目管理模式在運(yùn)營商CAPEX項(xiàng)目中的應(yīng)用[J];移動(dòng)通信;2015年10期
,本文編號:2197966
本文鏈接:http://www.lk138.cn/kejilunwen/chuanbolw/2197966.html