海陽核電2#機組鋼制穹頂結(jié)構(gòu)施工質(zhì)量管理研究
[Abstract]:With the development of the large-span heavy steel structure, it has been used in the design and construction of nuclear power station, and the heavy steel structure in the nuclear power station is generally different in shape and does not belong to the standard civil steel structure type. Therefore, according to the general civil steel structure construction methods and quality management requirements, it will be difficult to meet the requirements of nuclear power quality assurance grade, out of nuclear safety considerations, It will be an important and realistic subject to study a set of construction quality management method of heavy steel structure in the design and construction of nuclear power station. In the process of manufacturing and installation of nuclear power steel structure projects, various quality problems inevitably occur due to the influence of personnel qualifications and skills, raw materials, construction technical schemes, etc. In order to reduce and solve these frequent quality problems, it is more urgent to study a set of quality management methods for manufacturing and installation of heavy-duty steel structures in nuclear power plants to guide production and construction. Through the construction process of steel dome structure of Haiyang nuclear power unit in 2#, the quality management method of large-span heavy-duty steel structure in nuclear power station is studied and discussed. This paper first introduces the research situation at home and abroad and the key points and difficulties of construction quality management of nuclear power steel structure engineering, and analyzes and summarizes the difficulties. Then the common problems in the quality management activities are analyzed, and the problems are classified and summarized by the expert scoring method, and the characteristics of the quality management problems are summed up, which are solved one by one with the classification of the quality management problems in the later stage. Secondly, according to the quality management method of 4M1E and the requirement of nuclear power field management, the causes of common quality problems are analyzed by stratification method. Taking the whole process of construction quality management of dome structure engineering as an example, the whole paper is prepared according to the pre-construction period. The main work points of the three stages of construction completion and acceptance are discussed, the methods of quality management of dome engineering are clarified, and the common quality problems are explained in the quality management method. So that the quality management method can not only effectively solve the quality problems, but also prevent the quality problems easily occurring in advance. Finally, the paper expounds the measures to guarantee the construction quality management of dome engineering. Through the definition and refinement of the organizational system and system, quality assurance procedures, division of duties, personnel authorization management, and the implementation of key and difficult points in the process of quality management, some clear measures are put forward. To make the quality management measures more effective and smooth implementation. The research results have important guiding function to the construction quality management of the large-span heavy steel structure engineering of nuclear power plant, and have certain reference value to the construction quality management of other similar nuclear power projects in our country.
【學(xué)位授予單位】:哈爾濱工業(yè)大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TU758.11;TU712.3
【參考文獻】
相關(guān)期刊論文 前10條
1 黃瑩;周福新;李清立;;基于卓越績效模式的建筑工程質(zhì)量管理研究[J];工程管理學(xué)報;2016年02期
2 宋永濤;蘇秦;;質(zhì)量管理實踐、新產(chǎn)品開發(fā)能力與新產(chǎn)品開發(fā)績效關(guān)系研究[J];科技進步與對策;2016年09期
3 周福新;黃瑩;李清立;;基于流程化視角的建筑工程項目質(zhì)量管理研究[J];工程管理學(xué)報;2016年01期
4 孫奕;;工程項目質(zhì)量全過程管理問題探析[J];長沙鐵道學(xué)院學(xué)報(社會科學(xué)版);2014年04期
5 文東華;陳世敏;潘飛;;全面質(zhì)量管理的業(yè)績效應(yīng):一項結(jié)構(gòu)方程模型研究[J];管理科學(xué)學(xué)報;2014年11期
6 王楊楊;楊衛(wèi)振;王文君;;施工質(zhì)量預(yù)控研究[J];科技創(chuàng)新與應(yīng)用;2014年29期
7 鄧斌;;高等教育大眾化發(fā)展道路中教育質(zhì)量體系構(gòu)建研究[J];內(nèi)蒙古師范大學(xué)學(xué)報(教育科學(xué)版);2014年10期
8 章春軍;呂曉琴;;基于質(zhì)量管理的大學(xué)生科技創(chuàng)新項目管理研究[J];中國科技論壇;2014年08期
9 徐暉;胡淼;;EPC模式下核電項目業(yè)主的工程質(zhì)量管理[J];中國核電;2014年02期
10 方勇;鄭銀霞;;全面質(zhì)量管理在科研管理中的應(yīng)用與發(fā)展[J];科學(xué)學(xué)與科學(xué)技術(shù)管理;2014年02期
相關(guān)會議論文 前1條
1 曹振鋼;;建筑施工質(zhì)量控制點的設(shè)置與控制[A];2013年3月建筑科技與管理學(xué)術(shù)交流會論文集[C];2013年
相關(guān)碩士學(xué)位論文 前2條
1 張靜;百合公寓工程施工階段質(zhì)量控制研究[D];南京理工大學(xué);2011年
2 蔣玉林;核電工程施工階段質(zhì)量控制研究[D];上海交通大學(xué);2008年
,本文編號:2258026
本文鏈接:http://www.lk138.cn/jianzhugongchenglunwen/2258026.html