城市道路干線協(xié)調(diào)控制配時(shí)優(yōu)化研究
[Abstract]:Since the reform and opening up, with the rapid development of China's economy, the number of urban motor vehicles has increased dramatically. Especially in the past ten years, when more and more people enjoy the convenient and comfortable life brought by motor vehicles, the following problems such as traffic congestion, exhaust emissions and so on also greatly restrict the development of economy and society. We know that the key road sections that lead to urban traffic congestion are urban road intersections, so we need to improve the traffic capacity and minimize the delay of urban intersections. There are many ways to alleviate traffic congestion, including widening the road surface, building viaduct and so on, but these methods are limited because of the shortage of road land. The other is to optimize the timing of a single intersection, but the result of this "separate" optimization scheme is that there is no coordination between the intersections, which may lead to more congestion at some intersections. Therefore, no matter from which point of view, it is urgent to solve the traffic congestion problem. Although some scholars at home and abroad have carried out research in this area, but there are still some shortcomings. This paper starts with the timing of signal lights. First of all, the research background and development status of traffic signal control are described, and the lack of research is analyzed. Secondly, the basic parameters of traffic signal, the basic control method of traffic signal and the evaluation index of control effect related to the coordinated control of urban trunk road are introduced, and the coordinated control mode of trunk line system is analyzed. The coordinated control of urban main road signal lamp is discussed in detail, and the design basis and design idea of the control system are further clarified through the research. Two kinds of phase difference optimization techniques commonly used in trunk road coordination control are described, especially three methods in the maximum green band method are introduced in detail. Then the basic principle and main steps of the coordinated control timing scheme for the main road are summarized. Finally, taking the main road of Vermilion Bird Street in Xi'an as an example, the trunk line coordination control is carried out at several consecutive adjacent intersections of the trunk line. The VISSIM4.3 simulation software satisfying the working length of the road network is used to further verify the coordination control effect. The results show that the vehicle delay and queue length of the trunk line are obviously reduced after the coordinated control of the main road is carried out, which indicates that the coordinated control scheme is effective.
【學(xué)位授予單位】:長(zhǎng)安大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:U491.54
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 郭宏玉;高媛;姚樹森;;城市道路交叉口交通信號(hào)配時(shí)優(yōu)化研究[J];汽車實(shí)用技術(shù);2016年09期
2 王進(jìn);鄒志云;葛歡;周志浩;;考慮上游信號(hào)的交叉口延誤計(jì)算[J];交通運(yùn)輸系統(tǒng)工程與信息;2015年01期
3 李元;余立建;張樂;;城市交通干線協(xié)調(diào)控制[J];交通科技與經(jīng)濟(jì);2014年03期
4 唐克雙;孔濤;王奮;李克平;;一種改進(jìn)的多帶寬干線協(xié)調(diào)控制模型[J];同濟(jì)大學(xué)學(xué)報(bào)(自然科學(xué)版);2013年07期
5 傅白白;仇錦;;基于VISSIM仿真的信號(hào)交叉口優(yōu)化研究[J];山東科學(xué);2013年03期
6 王力揚(yáng);周鈺嚴(yán);;交叉口相位及信號(hào)配時(shí)優(yōu)化[J];西安工業(yè)大學(xué)學(xué)報(bào);2012年12期
7 李繁;;城市道路典型交叉口交通信號(hào)配時(shí)優(yōu)化——以武漢市洪山區(qū)雄楚大道與靜安路交叉口為例[J];武漢交通職業(yè)學(xué)院學(xué)報(bào);2012年02期
8 程學(xué)慶;田芳銘;鞠蕾;王昕;;基于VISSIM的交通事件檢測(cè)仿真及數(shù)據(jù)處理[J];武漢理工大學(xué)學(xué)報(bào)(交通科學(xué)與工程版);2012年01期
9 溫璐茜;胡永舉;周靜;;干線交叉口信號(hào)燈線控系統(tǒng)配時(shí)設(shè)計(jì)實(shí)例分析[J];交通科技與經(jīng)濟(jì);2011年05期
10 盧凱;徐建閩;陳思溢;李林;;通用干道雙向綠波協(xié)調(diào)控制模型及其優(yōu)化求解[J];控制理論與應(yīng)用;2011年04期
相關(guān)博士學(xué)位論文 前3條
1 葉寶林;城市路網(wǎng)交通信號(hào)協(xié)調(diào)控制理論與方法研究[D];浙江大學(xué);2015年
2 宋現(xiàn)敏;城市交叉口信號(hào)協(xié)調(diào)控制方法研究[D];吉林大學(xué);2008年
3 栗紅強(qiáng);城市交通控制信號(hào)配時(shí)參數(shù)優(yōu)化方法研究[D];吉林大學(xué);2004年
相關(guān)碩士學(xué)位論文 前9條
1 侯永芳;干線綠波交通信號(hào)控制方法研究[D];吉林大學(xué);2015年
2 郭麗蘋;城市干道綠波帶配時(shí)方法研究[D];長(zhǎng)安大學(xué);2015年
3 于昊坤;道路交通干線協(xié)調(diào)控制信號(hào)配時(shí)方法研究及應(yīng)用[D];東南大學(xué);2015年
4 孟博翔;基于綠波帶的城市主干道交通優(yōu)化研究[D];蘭州交通大學(xué);2014年
5 卓亞娟;城市干道單行系統(tǒng)信號(hào)配時(shí)方法研究[D];長(zhǎng)安大學(xué);2013年
6 胡霆;城市交通干線綠波協(xié)調(diào)控制研究[D];上海交通大學(xué);2013年
7 肖秀春;干道協(xié)調(diào)下公交信號(hào)優(yōu)先方法研究[D];華南理工大學(xué);2012年
8 曹娟娟;城市干道交通信號(hào)協(xié)調(diào)優(yōu)化控制研究[D];長(zhǎng)沙理工大學(xué);2012年
9 王東;基于遺傳算法的城市干線交通信號(hào)協(xié)調(diào)控制研究[D];長(zhǎng)安大學(xué);2010年
,本文編號(hào):2497172
本文鏈接:http://www.lk138.cn/kejilunwen/daoluqiaoliang/2497172.html