川藏鐵路康定—昌都段滑坡堰塞湖減災(zāi)對策及橋梁施工新技術(shù)研究
[Abstract]:Natural disasters such as earthquake, landslide and dammed lake occur frequently in western mountainous area, but the related research is relatively weak. In order to ensure the safety of railway lines and traffic infrastructure and ensure the smooth passage of life after the disaster, landslide has become a key problem that hinders and restricts the construction of Sichuan-Tibet railway. Landslide dammed lake disaster chain becomes the risk source of prevention and control in the line selection design stage. At the same time, the planning line of Kangding-Changdu section of Sichuan-Tibet railway passes through the high cold area, the temperature in the high cold area is low, and the short construction season throughout the year is the inevitable natural factor hindering the local construction, so it is necessary to shorten the construction time of the site as far as possible. The construction of Sichuan-Tibet railway will face many difficult problems. Due to the limitation of time, this paper only analyzes the following two problems. First of all, this paper puts forward a set of operational procedures for risk assessment of river plugging, and the theoretical formulas suggested for each link. On the basis of this, taking the regulation of Desha landslide in Sichuan-Tibet railway as an example, using ANSYS processing model grid and FLAC3D 3D finite difference software to establish 3D landslide model, the stability of landslide is discussed, and the amount of flow into the river is determined by calculating the volume of penetrating body. Then the parameters such as slip distance, slope velocity and minimum amount of river plugging are calculated by using empirical formula, and the prediction results of possible river plugging in the case of large earthquakes are obtained. Finally, using the recommended formula to calculate the width and discharge of the crater, the discharge and water level of Hong Feng along the track, and to predict the affected area of the lake, the countermeasures for disaster reduction of the railway project are put forward. It can not only provide a reference for the design of line level in the study area and the layout of major projects, but also hope to promote the development of disaster reduction technology of railway disaster chain in mountainous areas through exemplary research. Secondly, aiming at the short construction period of bridge in traffic construction in alpine area, this paper analyzes and studies the international difficult problem that precast concrete bridge is widely used in alpine area. In this paper, the concept of new discontinuous steel joint, which is convenient for rapid construction, is innovated. The flexural bearing capacity test of 5 full-scale beam specimens with different joint parameters is carried out, and the optimum parameters of the new joint are obtained. The theory of mechanical structure is discussed by means of mechanical model of tension and compression bar. It is of great significance to study the construction of structures in alpine areas and to ensure the long-term safety of precast concrete bridges in alpine areas and emergency relief projects.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:U216.419.1;U445.4
【相似文獻(xiàn)】
相關(guān)期刊論文 前6條
1 譙珊;;孫中山與川藏鐵路建設(shè)的構(gòu)想[J];福建論壇(人文社會科學(xué)版);2013年05期
2 李志啟;;工程資訊[J];中國工程咨詢;2009年11期
3 ;川藏鐵路初步列入國家規(guī)劃 走向與318國道一致[J];巖土工程界;2008年11期
4 ;動態(tài)[J];中國西部;2009年01期
5 張洪文;常輝;陳永;紀(jì)小彬;;川藏鐵路風(fēng)沙路基的防護(hù)措施[J];中國高新技術(shù)企業(yè);2014年25期
6 ;[J];;年期
相關(guān)重要報紙文章 前10條
1 鐘蓓;88名代表聯(lián)名提議——2011年開建川藏鐵路[N];現(xiàn)代物流報;2008年
2 建萱;民建成都市委建言 盡快建設(shè)川藏鐵路[N];四川政協(xié)報;2008年
3 川報記者 楊曉譚 江琦 方曉哺 張宏平;盡快啟動川藏鐵路建設(shè)[N];甘孜日報(漢文);2008年
4 川報集團(tuán)特派記者楊曉 譚江琦邋方曉哺 張宏平;川藏鐵路:第二條“天路”箭在弦上[N];四川日報;2008年
5 劉昌福;川藏鐵路:時代的呼喚[N];雅安日報;2008年
6 記者 王代林;川藏鐵路初步列入國家規(guī)劃[N];四川日報;2008年
7 王代林;川藏鐵路初步被列入國家規(guī)劃[N];西部時報;2008年
8 本報記者 周華;我們該怎樣“迎接”川藏鐵路?[N];甘孜日報(漢文);2008年
9 孫紅麗;川藏鐵路線走向首次被披露[N];西部時報;2009年
10 本報記者 徐雅玲;川藏鐵路9月底開工[N];21世紀(jì)經(jīng)濟(jì)報道;2009年
相關(guān)碩士學(xué)位論文 前5條
1 仲志偉;川藏鐵路三江并流區(qū)岸坡特征及穩(wěn)定性分區(qū)[D];西南交通大學(xué);2015年
2 劉芳;川藏鐵路片巖凍融風(fēng)化特征研究[D];西南交通大學(xué);2016年
3 吳瑾;川藏鐵路季節(jié)性粗顆粒凍土直剪試驗(yàn)研究[D];西南交通大學(xué);2016年
4 曾森;川藏鐵路沿線高光譜數(shù)據(jù)處理與巖性識別研究[D];成都理工大學(xué);2016年
5 蔣正宣;川藏鐵路康定—昌都段滑坡堰塞湖減災(zāi)對策及橋梁施工新技術(shù)研究[D];西南交通大學(xué);2017年
,本文編號:2345654
本文鏈接:http://www.lk138.cn/kejilunwen/daoluqiaoliang/2345654.html