隧道工程預(yù)算成本管理中存在的問(wèn)題與對(duì)策
發(fā)布時(shí)間:2018-05-15 01:35
本文選題:隧道工程 + 預(yù)算成本管理 ; 參考:《科技資訊》2017年04期
【摘要】:隨著我國(guó)社會(huì)的不斷發(fā)展,技術(shù)水平的不斷提高,我國(guó)越來(lái)越多的交通工程建設(shè)中都開(kāi)始修建高造價(jià)的隧道。隧道工程的建設(shè)需考慮到諸多問(wèn)題,比如地表原因?qū)е碌牟疬w困難、建筑物密集等,所以大多數(shù)的隧道工程都是使用地下暗挖式。隧道工程多在城市軌道、鐵路、公路及水利工程中應(yīng)用,其具有較高的成本;诖,該文就主要研究隧道工程預(yù)算成本管理中出現(xiàn)的問(wèn)題,并且提出相應(yīng)的對(duì)策,以降低隧道工程的預(yù)算成本。
[Abstract]:With the development of our society and the improvement of technical level, more and more high cost tunnels have been built in the construction of traffic engineering in our country. Many problems need to be taken into account in the construction of tunnel engineering, such as the difficulty of demolition caused by surface reasons, dense buildings and so on, so most tunnel projects use underground digging type. Tunnel engineering is widely used in urban rail, railway, highway and water conservancy projects, which has high cost. Based on this, this paper mainly studies the problems in the budget cost management of tunnel engineering, and puts forward corresponding countermeasures in order to reduce the budget cost of tunnel engineering.
【作者單位】: 中鐵一局集團(tuán)第五工程有限公司;
【分類號(hào)】:F426.92;F406.7
【相似文獻(xiàn)】
相關(guān)期刊論文 前2條
1 于熙風(fēng),張小平,張宇;施工企業(yè)工程成本中有關(guān)問(wèn)題的思考[J];石家莊鐵道學(xué)院學(xué)報(bào);1997年02期
2 ;[J];;年期
相關(guān)重要報(bào)紙文章 前1條
1 周世祥;合同約定價(jià)款低于鑒定的工程預(yù)算成本如何認(rèn)定?[N];檢察日?qǐng)?bào);2004年
,本文編號(hào):1890407
本文鏈接:http://www.lk138.cn/gongshangguanlilunwen/1890407.html
最近更新
教材專著