資源受限項目調度模型的施工進度管理
發(fā)布時間:2018-05-20 21:40
本文選題:進度管理 + 資源約束; 參考:《同濟大學學報(自然科學版)》2017年10期
【摘要】:綜合資源受限項目調度問題的研究和實際建設工程項目施工進度管理的需求,提出廣義優(yōu)先關系下的差分進化人工蜂群算法的資源受限項目調度模型.其中差分進化算法用于處理交叉變異問題,人工蜂群算法用于處理尋優(yōu)過程的各階段推進,并以廣義優(yōu)先關系串行調度產生方案獲得的總工期作為適應度值確定優(yōu)先級編碼.根據(jù)實際工程項目的應用進一步提出由逆向反推計算關鍵路徑、關鍵任務的資源及歷時優(yōu)化、非關鍵任務的資源均衡等組成的資源約束進度管理方法.在eclipse環(huán)境下用Java語言進行編程,快捷準確地獲得進度和資源相關的資源約束進度計劃、約束資源分布情況,以及資源與工期的優(yōu)化方案.
[Abstract]:The research on the scheduling problem of comprehensive resource constrained project and the requirement of construction schedule management in the actual construction project, the resource constrained project scheduling model of differential evolution artificial bee colony algorithm under the generalized priority relationship is proposed, in which the differential evolution algorithm is used to deal with the cross mutation problem, and the artificial bee colony algorithm is used to deal with the optimization process. In accordance with the application of the actual project, the key path, the resource and diachronic optimization of key tasks, the resource balance of non critical tasks, etc. are further proposed. Management method. In the eclipse environment, it is programmed with Java language to quickly and accurately obtain schedule and resources related resource constraints schedule, constraint resource distribution, and optimization of resource and time limit.
【作者單位】: 同濟大學經(jīng)濟與管理學院;上海建科工程咨詢有限公司;
【基金】:上海市科委科研計劃(15DZ1203401) 上海市國資委項目(S15004)
【分類號】:TP18;TU722
,
本文編號:1916340
本文鏈接:http://www.lk138.cn/kejilunwen/zidonghuakongzhilunwen/1916340.html
最近更新
教材專著